Seattle General Contractors · Services
Home Remodeling
Update several rooms or a whole floor in one coordinated project, from opening up a layout to finishing a basement.

What a home remodel can include
Home remodeling covers projects bigger than a single room: opening the kitchen to the living area, reworking a main floor, converting a basement into living space, updating every bathroom, or bringing an older house’s systems and finishes up to date at the same time.
Doing the work as one project lets the trades work in a sensible order. Walls get opened once, wiring and plumbing are updated while they are exposed, and finishes go in after the dusty work is done.
Common whole-home goals
- Open layouts. Removing or opening walls between kitchen, dining and living rooms, with a beam where a wall was load-bearing.
- Basement finishing. Turning a basement into a bedroom, office, family room or suite, with moisture, egress and ceiling height checked first.
- System updates. Replacing older wiring, adding circuits, updating plumbing and improving insulation and ventilation.
- Consistent finishes. Flooring, trim, doors and paint that run through the house.
How we scope a larger remodel
We walk the house with you and list everything you want to change, then sort it into what has to happen together and what can wait. Larger remodels usually need a construction permit, and the city looks at how much of the house is being reworked. If you are reconfiguring spaces or replacing wall surfaces across most of a house, plan review gets more involved. We will explain what that means for your plan.
The written scope breaks the work into areas and trades so you can see what is included, what you will select and where decisions are still open.
Sequencing the work
Larger remodels run in a predictable order: protection and demolition, structural changes, rough plumbing, electrical and mechanical, inspections, insulation, drywall, then cabinets, flooring, tile, trim and paint. Problems happen when that order breaks, such as a floor installed before drywall dust is done, or a late wiring change after walls are closed. Making selections early, especially cabinets, windows and special-order fixtures, keeps the sequence intact. We map the order for your project at the start so you know what to decide and when.
What to have ready when you call
- A room-by-room list of what you want to change.
- Photos of each area, plus the electrical panel and the basement or crawlspace.
- Whether you plan to live in the house during the work.
- Any drawings, inspection reports or past permit records you have.
Questions homeowners ask
Should we do everything at once or in phases?
Doing it at once usually avoids opening the same walls twice. Phasing can still work if each phase is planned so later work does not undo earlier work.
Will we need to move out?
It depends on how much of the house is affected and whether a kitchen and bathroom stay usable. We will talk through the sequence with you.
Home Remodeling in Seattle
Planning this work in a Seattle home or building? Our Seattle page covers city permit rules, common housing types and local conditions for home remodeling.
Whole-Home Remodeling in Seattle: permits, homes and neighborhoods
Related services
Request a quote
Tell us what you want to change, where the property is and when you would like to start. Or call (206) 809-8956.
